Yapı Merkezi is constructing the fastest railway in East Africa. The first phase of the 1,224 km total line, the 202 km long Dar Es Salaam – Morogoro Railway Project, is the most critical part of the project. When the 5-part line is completed, it will connect Uganda, Rwanda, Democratic Republic of Congo and Tanzania, and provide access to the Indian Ocean for all related countries.
New Employment Opportunities at Yapı Merkezi Tanzania – Various Posts, October 2022
All works pertaining to design, manufacture, assembly and operation startup of track superstructure, electrification, signaling, telecommunication, central control systems are being carried out by Yapı Merkezi.
The vacancies announced here are for Lot 3 and Lot 4 projects. Yapı Merkezi can evaluate your application for one of the two projects. Therefore, it is assumed that you have agreed to this condition by applying for the job. If there is no job vacancy that suits you in the list below, you can still apply for a job from the ‘Job Applications‘ page.
Nafasi ya Kazi | Tuma Maombi |
---|---|
OPARETA WA BACK-HOE | TUMA MAOMBI |
MUEZEKAJI TILES | TUMA MAOMBI |
MHANDISI WA UJENZI | TUMA MAOMBI |
OPARETA WA DOZA | TUMA MAOMBI |
MKUFUNZI WA UDEREVA | TUMA MAOMBI |
DEREVA WA LORI LA MCHANGA | TUMA MAOMBI |
OPARETA WA EKSIKAVETA | TUMA MAOMBI |
OPARETA WA FOKOLIFT | TUMA MAOMBI |
DEREVA WA TENKI LA MAFUTA | TUMA MAOMBI |
OPARETA WA GREDA | TUMA MAOMBI |
OPARETA WA LODA | TUMA MAOMBI |
DEREVA WA TRELA YA KUPAKIA MAGARI MENGINE | TUMA MAOMBI |
DAKTARI | TUMA MAOMBI |
OPARETA WA KRENI INAYOTEMBEA | TUMA MAOMBI |
FUNDI RANGI | TUMA MAOMBI |
DAKTARI WA DHARULA | TUMA MAOMBI |
DEREVA WA LORI LA MAJI TAKA | TUMA MAOMBI |
MTAALAMU WA UTAFITI | TUMA MAOMBI |
FOKOLIFT YENYE BOOM | TUMA MAOMBI |
MTAFSIRI (SWAHILI-KITURUKI) | TUMA MAOMBI |
FUNDI WA MATAIRI | TUMA MAOMBI |
TUMA MAOMBI |